beBee background
Professionals
>
Utilities / Energy
>
Kampung Baru Jalan Malaysia
hanissyazwan cheabkarim

hanissyazwan cheabkarim

Piping engineering
Kampung Baru Jalan Malaysia, Kelantan
(0)

Social


About hanissyazwan cheabkarim:

Dear sir.
 

My name is Hanis Syazwan Ab Karim. 
At the moment, I'm looking for job opportunities available on your site.
I currently hold the position of Senior PIPING  ENGINEER. My responsibilities
include producing datasheet, specification, Material Take Off, PR,
Technical Bid Evaluation , TQ, Technical Clarification , vendors
documentation, drawing, procedure and report.
I am also experienced in piping fabrication and construction
engineering, I do cover material and fabrication drawing where i
covered design house drawing to fabrication drawing. Check and verify
all drawings as per P&ID, introduce spool and field weld, also pipe
support detail drawings. I am also responsible for making all related
fabrication procedures and the Hydrotest package.

I am mainly involved in the project management team which is involved
in design and engineering, procurement, quality control, planning,
cost control, and HSE coordination in ensuring meeting project
requirements.

I have attached my resume detailing my other qualifications and
achievements for your perusal.Should you be interested in me please
contact me.

 

Experience

SENIOR PIPING ENGINEER         2021  – …Current  Toshiba Plant Systems & Services Corp (TPSC Engineering)  Industry:  Power Plant   • Perform piping layout study to avoid interference in layout design and coordinate with piping design on 3-D model. • Reviewing engineering deliverables. Review & check the prepared drawings (PID,isometric,pipe support) before submission to client. Also involved in the final documentation of the piping/mechanical design package • Reviewing a technical aspect (procurement, construction engineering) • Produce required project reporting for Piping Engineering and coordination with other in-house departments. • Provide technical input during detail design, assisting in preparing a work packaging, assisting fabrication team during fabrication stage. • Prepare piping MTO ,RFQ, Purchase order, Prepare valve list, prepare bolt nut gasket list, SP item list, prepare Material Requisitions (MR) and Technical Bid Tabulation (TBT) , Technical Bid Evaluation (TBE).   • Liaise with Vendors for specific Technical Requirements. • Update delivery log sheet, procurement control sheet and update budget control sheet specific to piping material each project. • Continuously perform constructability review and ensure all produced IFC isometric is fit for purpose and fabrication • Communicate with QA/QC and HSE Engineer to ensure all necessary quality and safety elements are contained inside the workpack • Going to Thailand site as CSR to oversee installation work & clear all engineering STQ (site technical clarification) during installation phase (B.Grimm Power (Laem Chabang) 1 (BPLC1R) project and 2 projects under B.Grimm Power (AIE-MTP). BPAMR Block 1&2  Projects Involve  1. Developments of Combined Cycle Co-generation power plant 103mW B.Grimm Power (Laem Chabang) 1 Limited (BPLC1R)  Laem Chabang Industrial Estate Thailand (Current) 2. Developments of Combined Cycle Co-generation power plant 124mW B.Grimm Power (AIE-MTP) Limited (BPAMR Block 1& Block2 ) WHA Eastern Industrial Estate Map Ta Phut, Rayong Province Thailand (Current project)    PIPING ENGINEER          -2021   (PO CONTRACT)   WOOD GROUP MUSTANG Industry:  Oil and Gas Services  • Develop applicable piping specification and standard particularly to applies to Offshore Piping Engineering and Design • Perform piping layout study and coordinate with piping design on 3-D model. • Produce required project reporting for Piping Engineering and coordination with other in-house departments. • Perform wall thickness and branch reinforcing calculations. • Prepare piping MTO including pipe support. • Prepare requisitions, technical bid evaluations, and supplier document review.  • Perform thorough review of relevant vendor information. • Working knowledge of applicable Industry Code and Standard (API, ASME, ANSI). • Incorporate Wood Group Mustang procedures and standards into design as applicable. • Perform offshore site visit as and when required.   

  PIPING ENGINEER           2020 – 1 March 2021  OCEAN MIGHT  Industry:  Integrated Oil and Gas Services • Contracts and Procurement (Tender and Project Execution) • Participate in tender meeting. • Focal person to support in tendering for both technical and commercial part for oil and gas bidding process for piping discipline. • Perform Material Take-Off (include Dia-Inch, surface areas, spools quantity, joints quantity). based on Invitation to Bid (ITB) documents. • Focal person to counter check ITB MTO with Piping and Instrumentation Diagram (P&ID), datasheet, specification and client standard. • Focal person to prepare material take off (MTO) based on Issued for Review (IFR) and Issued for Approval documents. • Prepare and issue Purchase Requisitions for piping packages (Pipes, Fittings & Flanges, Valves, Gaskets, Stud bolts, Pipe Supports and SP item) • Prepare and issue Technical Clarifications for piping packages. • Complete Technical Bid Evaluations piping packages. • Interface with the Procurement Coordinator on the status of the technical package, inspection/test and vendor document requirements. • Coordinate a meeting or Kick-Off Meeting with piping vendors for on all technical issues.  • Engineering • Review on Project Specification and Procedures. • Review and comments on Vendor Drawings and Documents • Review check and comments for all deliverable Isometric Drawings, Pipe Support Details Drawings, Special Pipe Support Drawings, Piping Specification, Valve, Piping Bulk & Pipe Support P&ID, Valve & SP-Item TRP’s (Technical Requisition Package)  • Perform material take-off (Piping Bulk, Pipe Support and Manual Valve) as per Piping and Instrumentation Diagram (P&ID), PDMS Model Navisworks and Isometric drawings. • Participate to the weekly progress meeting and discipline progress meeting with consultant and client. • Interface with other concerned parties i.e. Design Consultant, other discipline engineers, procurement, project control, fabrication team, QA/QC and Commissioning Team.  • Construction • Prepare Permit to install (PTI) for submission to DOSH (Department of Occupational Safety and Health Malaysia) • Review and check on shop drawing / fabrication drawing, inclusive of Isometric Drawing, Piping Layout, Pipe Support Details, Pipe Support Location Plan and As-built documents. • Verify site modifications and incorporate all the changes (in red-line mark-up) into the PDMS model. • Prepare procedure for Hydrotest, Valve Leak Test, Reinstatement Leak Test and Flange Management. • Prepare hydrotest package • Prepare ship loose list.  Projects Involve (Construction) 1. Project: Mubadala Petroleum–Pegaga Wellhead Platform EPCIC End A    ( May 2020  Finish ) 2. Provision Of (EPCC) Of Pemanis Satellite (Pe-Sa) Topside for MURPHY’s Sarawak SK309 Development Feb 2020- Feb 2021 3. Provision Of EPCC & Installation Of Wellhead Platform For BKD-A And Host Tie-In Modification              At BNCPP-B Topsides          (Feb 2020- Feb 2021  Projects Involve (Tender ) 1. Project: Petronas Carigali–Provision Of Front End Engineering Services For Dulang East Project      May-June 2020 2. Project: : HESS–Provision Of EPCC For Phase 4A Facilities, North Malay Basin. Provision Of EPCC  & Installation Of Wellhead Platform (Dulang WHA Kangsar WHA Teratai WHC Welhead, and  Bergading CPP tie in modification              Aug-Sept 2020 3. Project: : Sarawak SHELL Bhd – Provision Of EPC Of Fixed Offshore Structure Works For  Timi Field Development Project          Oct  2020 

 PIPING ENGINEER                    2019 –   2020 SAPURA ENERGY Industry:  Integrated Oil and Gas Services • Over view client procedure, drawing, contract requirement in order to identify the scope work • To prepare project piping procedure, subcontractor tender and technical bid evaluation (TBE) • Reviewing and evaluating Piping Subcontractor’s Technical Bid Evaluation (TBE)  • To assist Superintendent/ coordinator to identify the scope work, technical data and subcontract over view details • Liaise and coordinate with relevant and respective department /parties (e.g.: client, supplier, subcontractor, project team and etc) on daily operation • Liaising with Engineering team for any technical issue and constructability matter.  • Monitor and ensure that actual progress at site are as per planned schedule and come up with recovery plan when progress is behind schedule.   • Attending meeting with client, subcontractor, other disciplines and other departments. • Liaising with Material management team in material tracking to ensure material deliveries are within the  • planned schedule.   • Highlighting to Engineering Dept for issuance of Purchase Requisition for short fall material due to miss-out from MTO or missing or damage. • Setting up Key Performance Index (KPI) for fabrication and construction works.   • Ensuring the hydrotest activity conducted and completed according to plan and priority as per latest planning package.   • Prioritizing the drawing issuance and/or material delivery to speed-up fabrication activity. • Monitoring progress and come-out with report (daily / weekly) for fabrication, installation, hydrotesting and reinstatement. • Ensuring subordinates (supervisor) monitor and update site work progress by subsystem • Monitoring piping construction completion  • To prepare any site technical query (STQ) to any deviated from specification or technical proposal. • Liaising with commissioning department in order to get same understanding while working on the priority system to be handed over for commissioning activities. • Resolve all quality matters for the project in conjunction with Manager, Quality assurance Department. • Follow up, receive and handover the IFC drawing/MTO/Cutting Plan from Yard Engineering to Construction team. • Ensure the Procurement ROS dates are meet as per Planning Package/Construction sequence. • Prepare hydrotest package. • Prepare Permit to install (PTI) for submission to DOSH (Department of Occupational Safety and Health Malaysia)  Projects  1. Project: Mubadala Petroleum–Pegaga Central Gas Processing Platform (CPP)    Feb 2019-  Feb 2020    TECHNICAL EXECUTIVE             2014- 2019 MALAYSIA MARINE AND HEAVY ENGINEERING HOLDINGS BERHAD (MMHE).   Industry:  Integrated Oil and Gas Services • Estimate the scope of work and schedule for marine repair work  • Liaise and coordinate with respective department supplier, subcontractors, project team to execute work • Prepare all Piping material needed and working schedule per project base on master schedule • Specify urgent & critical job, assist on scheduling, spares, materials, inspection & testing (NDT). • Carried out job inspection for subcontractor in order to achieve all requirements. • Supervise all work include job quality, safety & ensure job to complete on time. • Make daily safety briefing on safe and not safe act before start job. • Enforce on Safety basic requirement such as PPE, tools & equipment regulation. • Attend all safety activity organize by HSE department. • Job arrangement for all subordinates & subcontractors. • Deal with procurement for material basis. • Manage, review and prepare the SOW to subcontractors as per Company procedures. • Organize / take part in tender/bid initiation & review meeting.  

 PIPING ENGINEER            2013-  2014 National Oilwell Varco (NOV) Industry:  Integrated Oil and Gas Services • Coordinate all technical issues, drawings, such as pipe routine, support type and pipe . application for industrial, offshore and marine projects. • Review technical and requirement specifications of FRP pipe.  • Review P&ID, isometrics drawing and pipe layout drawing. • Prepare Material take off (MTO) based on isometrics and spool drawings. • Review of piping drawings mostly isometric drawing and layout drawing • Review & recommend support location & type. • Prepare spools drawing as per ISO/layout given from Client using smart plan software,  • Ensure all project meets client requirements. • Ensure all project delivered within FOB Fabrications on Board date to client. • Review of technical specifications • Perform engineering calculations related to FRP piping such as, support span, bending Stresses, restraint loads, support displacement and etc. based on project philosophy. • Preparing technical report and application solution for piping system. • Prepare Material take off (MTO), Bil of material BOM and man hour estimates from engineering drawings. • Work closely with clients and piping draftsmen to provide professional advice on piping design and assembly drawing  Projects Involved: 1. Project: DSME / Chevron – Wheatstone LNG Platform              Feb 2013-Aug 2014 2. Project: JGC/PETRONAS – LNG Train 9                       July 2013-Aug 2014 3. Project: DSME / Chevron / Mafumeria Sul Platform         Aug 2013-Aug 2014 4. Project: COSCO (Qidong) QD500                     May 2013-Aug 2014 5. Project: Kawasaki Heavy Industries KHI 22N1712                    Apr 2013-July 2013 6. Project: Kawasaki Heavy Industries KHI 22N1713                      Apr 2013-Dec 2013 7. Project: Mitsubishi Heavy Industries / LNG Osaka LNGC Osaka (MHI S2299)                   June 2013-July 2013 8. Project: YZJ 2011 (1010 10007, 1008) – 10000 TEU Container Ship                                    June 2013-Aug 2013 9. Project: POSCO Plantec / Cameron Mafumeria Skid                       Nov 2013 –Aug 2014 10. Project: SHI H2067 / H2071                                         June 2013-Oct 2013 11. Dyna Glass Fuel Gas System Package                                        June 2013-July 2013   

 ENGINEER (Marine)                         2012- 2013 Lunar Shipping / Pendamar Marine Sdn. Bhd. Port Klang Industry:  Marine / Shipping • Measurement of quantity before and after discharge by means of draught Survey. • Estimate marine loading barge/ship base on the draught mark and referring to the stability booklet • Obtaining the correct quantity of vessel bunker on board ROB survey onboard on company vessel. • Calculate the volume of all fluid ROB that carry by the ship by referring to stability booklet especially diesel oil. • Monitor the ship trim • Technical supporter for entire repair and maintenance job for the vessel.   FIELD PIPING ENGINEER (Flange Management)        2011-   2012 Pre & Tec Sdn Bhd. Industry:  Integrated Oil and Gas Services • Interpreting the Piping and Instrument Diagram (P&ID) • Interpreting the piping Isometric drawing • Inspection of flange related spool fabrication, erection, flange assembly and tightening in accordance with project procedures and specifications. • To keep statistic of flange defect or flange assurance for non-compliance cases • To check and provide torque/tensioning value for all flanges including non-standard flanges • Compile all the joints report and submit to client Quality Engineer • Produce and write clear, concise records on the results of inspections. • Update Joint Data system • Familiar with tender bidding/proposal preparation      TRAINEE ENGINEER                           July2010-  Nov 2010 Lunar Shipping / Pendamar Marine Sdn. Bhd. Port Klang, Selangor Industry: Marine / Shipping • Attached to several Engineering Departments and was guided by several disciplines’ engineers  • Appointed as assistant engineer and technical supporter for entire repair and maintenance job for the vessel.   Education Bachelor of Engineering (Marine Technology) Naval Architecture & Shipbuilding  

 

 

Education

ducation Bachelor of Engineering (Marine Technology) Naval Architecture & Shipbuilding  Malaysian Institute of Marine Engineering Technology (MIMET)        Matriculation Kolej MARA Kulim, Kedah           Sijil Pelajaran Malaysia (SPM)          MRSM Kuala Krai, Kuala Krai, Kelantan 

Professionals in the same Utilities / Energy sector as hanissyazwan cheabkarim

Professionals from different sectors near Kampung Baru Jalan Malaysia, Kelantan